Professional Services Automation Data Dictionary

Assignment_Settings__c

Label: Assignment Settings

Field NameField LabelCreated in VersionDescriptionTypeDefault Value
Adjust_Hours_Strategy_Respects_Holidays__c Adjust Hours Strategy Respects Holidays Pre-Spring 2018 If it is true, then Schedules created by "Adjust Hours Per Day" will respect holidays and create exceptions for them and adjust hours by spreading hours across other days.

Checkbox false
Allow_Resource_Currency_on_Assignment__c Allow Resource Currency Code on Assn Pre-Spring 2018 If selected, the cost rate currency code on an assignment is set to use the resource currency code.

Checkbox false
AssigRes_IsResource_Active_Lookup_FIlter__c AssigRes IsResource Active Lookup FIlter Pre-Spring 2018 Checkbox false
AssigRes_Is_Resource_Lookup_Filter__c AssigRes Is Resource Lookup Filter Pre-Spring 2018 Checkbox false
Assign_Multi_Resources_Columns_Field_Set__c Assign Multiple Resources Columns Spring 2023 Defines the columns that display in the Assign Multiple Resources to Project window.

Text(50)
Assign_Resource_Custom_Lookup_Columns__c Assign Resource Custom Lookup Columns Pre-Spring 2018 Text(255) 'Name,Account.Name,Is_Resource__c,Is_Resource_Active__c,Resource_Role__c'
Assign_Resource_Custom_Lookup__c Assign Resource Custom Lookup Pre-Spring 2018 Checkbox false
Assign_Resource_Milestone_Lookup_Columns__c Assign Resource Milestone Lookup Columns Pre-Spring 2018 Field to hold the comma separated list field api names that will displayed as column in milestone lookup popup.

Text(255) "Name"
Assign_Resource_Milestone_Lookup__c Assign Resource Milestone Lookup Pre-Spring 2018 Field to control display of custom milestone lookup on UI

Checkbox false
Assign_Resource_Milestone_Required__c Assign Resource Milestone Required Pre-Spring 2018 Field to mark custom milestone as required or not. If true, it is will be required and else not.

Checkbox false
Assignment_Name_Project_Name_Max_Length__c Assignment Name Project Name Max Length Pre-Spring 2018 Configuration of Max-Length of Project Name in auto generated Assignment Name.

Number(2,0) 38
Assignment_Name_Resource_Name_Max_Length__c Assignment Name Resource Name Max Length Pre-Spring 2018 Configuration of Max-Length of Resource Name in auto generated Assignment Name.

Number(2,0) 38
Auto_Assign_Allow_Non_Exact_Matching__c Auto-Assign: Allow Non-Exact Matching Summer 2022 Allows auto-assign to create assignments that may include non-exact resource matches.

Checkbox false
Auto_Share_with_New_Resource__c Auto Share with New Resource Pre-Spring 2018 Defines whether to share an assignment and schedule with the resource's Salesforce user on creation or when the resource is changed. You can set the value to Read or Edit to define the level of sharing. If no value is set, no action is taken.

Text(5)
Default_Scheduling_Strategy__c Default Scheduling Strategy Fall 2021 Indicates the default scheduling strategy displayed in the Assign Resource to Project window. Valid values are: Adjust Hours Per Day Calculate End Date, Level Schedule Calculate End Date, Ignore Availability Custom Percent Allocation Zero Hour Schedule

Text(60)
Delete_Share_from_Old_Resource__c Delete Share from Old Resource Pre-Spring 2018 Defines whether the existing share of the assignment and schedule with the resource's Salesforce user is deleted when the resource on the assignment is changed.

Checkbox false
Disable_Bill_Rate_Null_Check_in_Trigger__c Disable Bill Rate Null Check in Trigger Pre-Spring 2018 When selected, PSA does not check that bill rates have been applied.

Checkbox true
Disable_RPG_Role_Defaulting__c Disable RPG and Role Filter Defaults Fall 2019 Disables the default values for the Region, Practice, Group, and Role filters on the Assign Resource page.

Checkbox false
Display_Planned_Bill_Rate__c Display Planned Bill Rate Pre-Spring 2018 Checkbox false
Edit_Schedule_Default_Strategy__c Edit Schedule Default Strategy Pre-Spring 2018 The default scheduling strategy for the Edit Assignment Schedule page. Possible values are "level", "ignore", "day" and ''PercentAllocation" for "Calculate End Date, Level Schedule", "Calculate End Date, Ignore Availability", "Adjust Hours Per Day" and "Percent Allocation" respectively

Text(255) 'ignore'
Hide_Adjust_Hours_Scheduling_Strategy__c Hide Adjust Hours Scheduling Strategy Pre-Spring 2018 Indicates whether the Adjust Hours Per Day scheduling strategy is hidden on the Assign Resource to Project, Edit Assignment Schedule and Staffer Worksheet pages.

Checkbox false
Hide_Custom_Scheduling_Strategy__c Hide Custom Scheduling Strategy Pre-Spring 2018 Indicates whether the Custom Scheduling Strategy is hidden on the Assign Resource to Project and Staffer Worksheet pages.

Checkbox false
Hide_Ignore_Avail_Scheduling_Strategy__c Hide Ignore Avail Scheduling Strategy Pre-Spring 2018 Indicates whether the Calculate End Date Ignore Availability scheduling strategy is hidden on the Assign Resource to Project, Edit Assignment Schedule and Staffer Worksheet pages.

Checkbox false
Hide_Level_Schedule_Scheduling_Strategy__c Hide Level Schedule Scheduling Strategy Pre-Spring 2018 Indicates whether the Calculate End Date Level Schedule scheduling strategy is hidden on the Assign Resource to Project, Edit Assignment Schedule and Staffer Worksheet pages.

Checkbox false
Hide_Percent_Alloc_Scheduling_Strategy__c Hide Percent Alloc Scheduling Strategy Pre-Spring 2018 Indicates whether the Percent Allocation scheduling strategy is hidden on the Assign Resource to Project, Edit Assignment Schedule and Staffer Worksheet pages.

Checkbox false
Hide_Zero_Hour_Scheduling_Strategy__c Hide Zero Hour Scheduling Strategy Pre-Spring 2018 Indicates whether the Zero Hour Schedule scheduling strategy is hidden on the Assign Resource to Project and Staffer Worksheet pages.

Checkbox false
Link_Assignment_Header_Tooltip_Fields__c Link Assignment Header Tooltip Fields Pre-Spring 2018 Comma delimited list of API names of fields to be listed when hovering over the tooltip icon on the Link Assignment to Milestones page.

TextArea "Assignment_Number__c,Project__r.Name,Resource__r.Name,Is_Billable__c,Start_Date__c,End_Date__c,Scheduled_Hours__c"
Link_Methodology_Header_Tooltip_Fields__c Link Methodology Header Tooltip Fields Pre-Spring 2018 Comma delimited list of API names of fields to be listed when hovering over the tooltip icon on the Link Methodology to Assignments page.

TextArea "Name,project__r.name"
Link_Milestone_Header_Tooltip_Fields__c Link Milestone Header Tooltip Fields Pre-Spring 2018 Comma delimited list of API names of fields to be listed when hovering over the tooltip icon on the Link Milestone to Assignments page.

TextArea "Name,Target_Date__c,Milestone_Amount__c"
Link_Phase_Header_Tooltip_Fields__c Link Phase Header Tooltip Fields Pre-Spring 2018 Comma delimited list of API names of fields to be listed when hovering over the tooltip icon on the Link Phase to Assignments page.

TextArea "Name,project__r.name"
Mass_Assign_Milestone_Editable__c Mass Assign Milestone Editable Pre-Spring 2018 When true the Milestone field is shown in the quick update section and assignment detail section of the Mass Assign Resources to Project page. The field is also shown on the Mass Assign Projects to Resource page.

Checkbox false
Mass_Assign_Milestone_Required__c Mass Assign Milestone Required Pre-Spring 2018 When true the Milestone field must be completed for each assignment to be created on the Mass Assign Projects to Resource page and the Mass Assign Resources to Project page.

Checkbox false
Mass_Assign_Projects_Load_Limit__c Mass Assign Projects Load Limit Pre-Spring 2018 Controls how many projects are returned in the results when searching on the Mass Assign Projects To Resource page. Values higher than 2000 are not recommended due to risk of exceeding platform view state. Default value is 1000.

Number(5,0) 1000
Mass_Assignments_Default_Ignore_Holidays__c Mass Assignments Default Ignore Holidays Pre-Spring 2018 Determines whether the Mass Assignment Ignore Holidays checkbox is checked by default.

Checkbox true
Multi_Assign_Assignment_Fieldset_Name__c Multi Assign Assignment Fieldset Name Pre-Spring 2018 Allows users to create a custom fieldset on the Assignment object and write the fieldset's API name to this custom setting. Fields added to this fieldset are displayed as read-only fields on the Multi Assigned Assignment to Milestone UI.

Text(255) "LinkMilestoneAssignmentColumns"
Multi_Assign_Milestone_Fieldset_Name__c Multi Assign Milestone Fieldset Name Pre-Spring 2018 Allows users to create a custom fieldset on the Milestone object and write the fieldset's API name to this custom setting. Fields added to this fieldset are displayed as read-only fields on the Multi Assigned Assignment to Milestone UI.

Text(255) "LinkAssignmentMilestoneColumns"
Retain_Schedule_On_Assign__c Retain Schedule On Assign Spring 2021 When True, an existing schedule held on a resource request is reused for a subsequent assignment on that request rather than creating a new schedule for the assignment. The default value is False.

Checkbox false
Retain_schedule_exceptions_on_update__c Retain schedule exceptions on update Pre-Spring 2018 If deselected, when a schedule's date range is changed, schedule exceptions that are partly or wholly outside the schedule's date range are deleted. Note: This potentially alters part of the schedule that is still within range. If selected, when a schedule's date range is changed, schedule exceptions that are wholly outside the schedule's date range are deleted. Schedule exceptions that are partly outside the schedule's date range are shortened to fit within the new schedule date range.

Checkbox false
Role_Hidden__c Role Hidden Pre-Spring 2018 If set to true, the Role pick list field is hidden from the Assign Resource(s) to Project page. If set to false, existing behavior continues. It will work only when "Role Required on Creation" checkbox is set to false

Checkbox false
Role_Required_On_Creation__c Role Required On Creation Pre-Spring 2018 Default false/UN-checked, current behavior continues (role pick list optional). If checked will make the Role pick list required and add the usual vertical red stripe to the left side of the field to indicate that it is required.

Checkbox false
Timecard_Statuses__c Timecard Statuses Pre-Spring 2018 Text(255) 'Submitted,Approved'
Update_Project_Monitor_Fields_Batch_Size__c Update Project Monitor Fields Batch Size Pre-Spring 2018 Determines the batch size to use when calculating Project Monitor fields.

Number(8,0) 2000
Update_Project_Monitor_Fields_Sync_Limit__c Update Project Monitor Fields Sync Limit Pre-Spring 2018 Defines the threshold number of assignments for immediately calculating Project Monitor fields. If the number of assignments exceeds the value of this setting, Project Monitor fields are calculated using a batch process.

Number(8,0) 10000
Use_Default_Cost_Rate_Clear_on_Assigning__c Use Default Cost Rate Clear on Assigning Pre-Spring 2018 Indicates whether the default value of the Use Default Cost Rate checkbox is unchecked on the Assign Resource to Project, Mass Assign Resources to Project and Mass Assign Projects To Resource pages.

Checkbox false
Use_Scheduled_Days__c Use Scheduled Days for Calculations Fall 2018 Use the value recorded in the Scheduled Days field on assignments for calculations on the Project Cost and Revenue Summary.

Checkbox false


© Copyright 2009–2023 Certinia Inc. All rights reserved. Various trademarks held by their respective owners.