Utilization Setup Fields
Here is a description of the fields on a utilization setup record.
Key: * – Mandatory field
Setup Details
Field |
|
Description |
Default Value |
---|---|---|---|
Active | Indicates the utilization setup record used for each utilization run. You can only have one active utilization setup record. | ||
Calculate Hours for Threshold Values | When selected, calculates the unheld resource request hours and weighted hours for the given threshold values. | deselected | |
End Date | The end date of the utilization run when Specify a custom date range for Utilization is selected in the Utilization Period field. | ||
Only Include Changes | When selected, only records from the earliest change are included in utilization runs. | ||
Start Date | The start date of the utilization run when Specify a custom date range for Utilization is selected in the Utilization Period field. | ||
Utilization Period | * | The utilization period covered by each utilization run. | |
Utilization Setup Name | The utilization setup record identifier. The format is US followed by a generated number. |
Threshold Values
Field |
Description |
Default Value |
---|---|---|
Threshold Value 1 | The first threshold value used for calculating the hours and weighted hours for unheld resource requests on the utilization result record. | 40% |
Threshold Value 2 | The second threshold value used for calculating the hours and weighted hours for unheld resource requests on the utilization result record. | 50% |
Threshold Value 3 | The third threshold value used for calculating the hours and weighted hours for unheld resource requests on the utilization result record. | 60% |
Threshold Value 4 | The fourth threshold value used for calculating the hours and weighted hours for unheld resource requests on the utilization result record. | 70% |
Threshold Value 5 | The fifth threshold value used for calculating the hours and weighted hours for unheld resource requests on the utilization result record. | 80% |
Threshold Value 6 | The sixth threshold value used for calculating the hours and weighted hours for unheld resource requests on the utilization result record. | 90% |
Batch Settings
Field | Description | Default Value |
---|---|---|
Assignment Batch Size | The maximum number of assignment records to process in a single batch for a utilization run. | 250 |
Held Resource Request Batch Size | The maximum number of held resource request records to process in a single batch for a utilization run. | 250 |
Resource Batch Size | The maximum number of resource records to process in a single batch for a utilization run. | 25 |
Schedule Exception Batch Size | The maximum number of schedule exceptions to process in a single batch for a utilization run. | 250 |
Timecard Batch Size | The maximum number of timecards to process in a single batch for a utilization run. | 1400 |
Unheld Resource Request Batch Size | The maximum number of unheld resource request records to process in a single batch for a utilization run. | 500 |
Utilization Result Batch Size | The maximum number of utilization result records to process per batch. | 9,900 |
Utilization Run Monitor Interval | The frequency in minutes that the Utilization Run Monitor executes after a utilization run has started. The Utilization Run Monitor checks for uncatchable exceptions within the process, preventing the utilization run from processing indefinitely. | 60 |
Work Calendar Batch Size | The maximum number of work calendars to process in a single batch for a utilization run. | 300 |
Lightning Action Buttons
The following Lightning action buttons are available:
Action | Description |
---|---|
Schedule Utilization Run | Create a utilization scheduled job. |
Start Utilization Run | Start a utilization run using the utilization setup. |