Utilization Calculation Fields

Calculating utilization on an RPGAbbreviation of region, practice, group. or resource creates a parent utilization calculation record together with one or more child utilization detail records. If your administrator has configured PSA to calculate a summary of capacity demand by role, child utilization summary records are also created.

Utilization Calculation

Here is a description of the fields on the Utilization Calculation object.

Key: C – Displayed depending on the options your administrator has set.

Field   Description
Calculate Historical Utilization   Indicates whether utilization was calculated using historical timecardA mechanism for logging time against a project or an assignment. records.
Calculate Scheduled Utilization   Indicates whether forward-looking utilization was calculated using assignmentConnection between a resource and a project. records.
Delete Prior Calculation   Indicates whether the previous calculations and details are to be deleted when utilization is calculated. Whether the calculation is deleted also depends on the combination of RPGAbbreviation of region, practice, group., resourceA contact that works on a project. and time periodA period of time with a start date and an end date to which forecasts, actuals calculations, billing event batches, utilization calculations and region plans belong.. name or the time period parent combination. This option only works when the current utilization calculation is the Master and has the same effect as clearing the Is Report Master checkbox.
Error Details   Errors that occurred during the calculation.
Historical Utilization Cut-Off Date   When historical utilization calculations stopped for this utilization calculation. Typically, this is the last day of the week that all timecards were entered.
Historical Utilization Start/End Dates   Start and end dates used to calculate historical utilization.
Include Sublevels   Indicates whether the calculation applies to all sublevels of the selected regionA level of hierarchy used in PSA to which other objects belong such as resources, opportunities and projects./practiceA level of hierarchy used in PSA to which other objects belong such as resources, opportunities and projects./groupA level of hierarchy used in PSA to which other objects belong such as resources, opportunities and projects.. When utilization is calculated on a resource, this field is ignored.
Is Report Master   Indicates whether the utilization calculation is the master calculation for the combination of RPGAbbreviation of region, practice, group., resourceA contact that works on a project. and time periodA period of time with a start date and an end date to which forecasts, actuals calculations, billing event batches, utilization calculations and region plans belong..
Owner   The user who generated the utilization calculation.
Region/Practice/Group/Resource   The Region/Practice/Group/Resource to which the utilization calculation relates.
Scheduled Utilization Start/End Dates   Start and end dates used to calculate scheduled utilization.
Status   Status of the calculation.
Time Period   Time period to calculate the utilization for.
Time Period Types   The time period types to calculate the utilization for.
Type   The type of utilization calculation to be generated. You can choose from the following depending on the options that your administrator has set:
  • Last Week
  • Current Week and Last Week
  • Week to Date
  • Week Forecast
  • Current Week and Next Week
  • Last, Current and Next Week
  • Next Week
  • Last Month
  • Current Month and Last Month
  • Month to Date
  • Month Forecast
  • Current Month and Next Month
  • Last, Current and Next Month
  • Next Month
  • Last Quarter
  • Current Quarter and Last Quarter
  • Quarter to Date
  • Quarter Forecast
  • Current Quarter and Next Quarter
  • Last, Current and Next Quarter
  • Next Quarter
  • Last Year
  • Last Year and Current Year
  • Year to Date
  • Year Forecast
  • Current Year and Next Year
  • Last, Current and Next Year
  • Next Year
Utilization Calculation Name   Name of the utilization calculation.
Subtotal by Group C The group on which to subtotal the utilization calculation.
Subtotal by Region C The region on which to subtotal the utilization calculation.
Subtotal by Practice C The practice on which to subtotal the utilization calculation.
Include Sublevels in Subtotals C Indicates whether the Subtotal fields are to include all sub levels of the selected region, practice or group.

Utilization Summary

Here is a description of the fields on the Utilization Summary object.

Key: R – Read-only.

Field   Description
Actual Credited Hours   Number of time credited hours.
Actual Non-Billable Hours   Number of non-billable hours.
Assigned Non-Billable Hours   Number of non-billable hours calculated from assignments.
Time Period   Time period used in the calculation.
Total Hours R Formula field that shows total capacity demand for the resource role, based on Assigned Billable Hours + Assigned Excluded Hours + Assigned Credited Hours + Assigned Non Billable Hours + Held Hours + Unheld Hours.

The value of this field is not affected by the likelihood of closing a parent Opportunity.
Actual Billable Hours   Number of billable hours.
Actual Excluded Hours   Number of time excluded hours.
Assigned Billable Hours   Number of billable hours calculated from assignments.
Assigned Credited Hours   Number of time credited hours calculated from assignments.
Assigned Excluded Hours   Number of time excluded hours calculated from assignments.
Calendar Hours   The number of working hours for the resource role over the duration of the scheduled utilization period calculated.

Represents the total supply of hours, or capacity, of the resource role.
Held Hours   Number of hours from held resource requests where the Resource lookup field contains a value and the Resource Held checkbox is selected.
Held Hours Opp Pct Weighted   The number of hours from held resource requestsOccurs when a named resource has been reserved (held) against, but not booked to, a project or opportunity. Also referred to as "soft booking"., weighted by the Probability % field on the associated Opportunity.
Region/Practice/Group   The region, practice or group to which the summary relates.
Remaining Capacity R Formula field that shows remaining capacity for the resource role once all hours from assignments and resource requests are accounted for. Based on (Calendar Hours - Assigned Hours - Held Resource Request Hours - Unheld Resource Request Hours) / Calendar Hours.
Resource Role   The resource role for which capacity demand into the future is summarized.
Target Hours   Target hours to be worked during the time period.

Represents the expected output of the resource role.
Total Hours Opp Pct Weighted R Formula field that shows total capacity demand for the resource role, weighted by the probability of closing the associated Opportunity. Based on Assigned Billable Hours + Assigned Excluded Hours + Assigned Credited Hours + Assigned Non Billable Hours + Held Hours Opp Pct Weighted + Unheld Hours Opp Pct Weighted.
Type   The permutation of region and practice used in the calculation.
Unheld Hours   Number of hours from unheld resource requests (where the Resource lookup field does not contain a value and the Resource Held checkbox is deselected). Represents a portion of total capacity demand for the resource role within the parameters of the summary.
Unheld Hours Opp Pct Weighted   The number of hours from unheld resource requests, weighted by the Probability (%) field on the associated Opportunity.
Utilization Calculation R Name of the utilization calculation.
Utilization Summary Name R System generated unique identifier.

Utilization Calculation Detail

Here is a description of the fields on the Utilization Calculation Detail object.

Field Description
Region/Practice/Group/Resource The Region/Practice/Group/Resource to which the calculation relates.
Time Period Time period used in the calculation.
Time Period Type Time period type used in the calculation.
Total Utilization Scheduled and historical utilization for the calculation detail record, calculated using the formula:
(Scheduled Billable Hours + Historical Billable Hours + Scheduled Credited Hours + Historical Credited Hours) / (Scheduled Calendar Hours + Historical Calendar Hours - Scheduled Excluded Hours - Historical Excluded Hours)
Total Utilization (Billable Only) Total Utilization minus Scheduled Credited Hours and Historical Credited Hours. Calculated using the formula:
(Scheduled Billable Hours + Historical Billable Hours) / (Scheduled Calendar Hours + Historical Calendar Hours - Scheduled Excluded Hours - Historical Excluded Hours)
Utilization Calculation Name of the parent utilization calculation to which the detail record relates.
Utilization Detail Id Unique ID of the utilization calculation detail record.
Utilization Target Calculated using the formula:
Utilization Target Hours / ( Historical Calendar Hours + Scheduled Calendar Hours)
Utilization Target Attainment Utilization achieved, calculated using this formula:
Total Utilization / Utilization Target
Utilization Target Hours The scheduled and historical target utilization hours.

Historical

This section contains utilization numbers calculated from events that occurred in the past, such as billable hours recorded on timecards.

Field Description
Historical Billable Hours Billable hours calculated from timecards.
Historical Calendar Hours The number of working hours for the historical utilization period calculated. For instance, if you calculate the historical utilization for the month of December on 2nd December, the Historical Utilization Calendar Hours will be 24 if the time period starts on the last day of November and the working calendar is 8 hours per day.
Historical Credited Hours Number of historical hours to count towards the numerator of the utilization calculation.
Historical Excluded Hours Hours on timecards where the project has the Time Excluded checkbox selected.
Historical Non Billable Hours Number of non billable hours calculated from timecards before the Historical Utilization Cut-Off Date.
Historical Scheduled Billable Hours Billable hours calculated from assignments that were scheduled as part of an assignment before the Historical Utilization Cut-Off Date.
Historical Scheduled Credited Hours Number of scheduled hours before the Historical Utilization Cut-Off Date that count towards the numerator of the utilization calculation.
Historical Scheduled Excluded Hours Hours on future assignments that occur before the Historical Utilization Cut-Off Date where the project has the Time Excluded checkbox selected.
Historical Scheduled Held Hours Number of historical hours from held resource requests the occur before the Historical Utilization Cut-Off Date where the Resource lookup field contains a value and the Held checkbox is selected.
Historical Scheduled Non Billable Hours Non-billable hours from assignments that are not credited or excluded, which occur before the Historical Utilization Cut-Off Date.
Historical Utilization Calculated using the formula:
(Historical Billable Hours + Historical Credited Hours) / (Historical Calendar Hours - Historical Excluded Hours)
Historical Utilization (Billable Only) Historical Utilization without historical credited hours. Calculated using the formula:
(Historical Billable Hours ) / (Historical Calendar Hours - Historical Excluded Hours)
Historical Utilization Start/End Dates Start and end dates used to calculate historical utilization.
Historical Utilization Target Percentage utilization target during the selected time period. The formula for this field is: Historical Utilization Target Hours / Historical Utilization Calendar Hours.
Historical Utilization Target Attainment Percentage of the historical utilization target achieved. The formula used to calculate the value in this field is:
Historical Utilization / Historical Utilization Target.
Historical Utilization Target Hours Target hours to be worked during the time period. This does not include hours in the future.

Scheduled

This section contains projected utilization numbers calculated from events that are scheduled to occur in the future such as billable hours in an assignment.

Key: A – Only available if the PSA Reporting Expansion Pack package is installed.

Field   Description
Month A Formula field used in PSA reports that shows the Scheduled End Date.
Remaining Capacity Hours A Formula field used in PSA reports that shows remaining capacity based on Scheduled Calendar Hours minus Total Scheduled Hours.
Scheduled Billable Hours   Billable hours calculated from assignments.
Scheduled Calendar Hours   The number of working hours for the scheduled utilization period calculated.
Scheduled Credited Hours   Number of scheduled hours to count towards the numerator of the utilization calculation.
Scheduled Excluded Hours   Hours on future assignments where the project has the Time Excluded checkbox selected.
Scheduled Held Hours   Number of hours from held resource requests where the Resource lookup field contains a value and the Resource Held checkbox is selected.
Scheduled Non-Billable Hours   Non-billable hours from assignments that are not credited or excluded.
Scheduled Start/End Dates   Start and end dates used to calculate scheduled utilization.
Scheduled Utilization   Calculated using the formula:
(Scheduled Billable Hours + Scheduled Credited Hours) / (Scheduled Calendar Hours - Scheduled Excluded Hours).
Scheduled Utilization (Billable Only)   Scheduled utilization minus scheduled credited hours. Calculated using the formula:
(Scheduled Billable Hours ) / (Scheduled Calendar Hours - Scheduled Excluded Hours).
Scheduled Utilization Target   Percentage scheduled utilization target for the resource during the selected time period. The formula for this field is:
Scheduled Utilization Target Hours / Scheduled Calendar Hours.
Scheduled Utilization Target Attainment   Percentage of the scheduled utilization target achieved. The formula used to calculate the value in this field is:
Scheduled Utilization / Scheduled Utilization Target.
Scheduled Utilization Target Hours   Target hours to be worked during the scheduled time period. This does not include hours in the past.
Total Scheduled Hours A Formula field used in PSA reports that shows the sum of all total scheduled hours including those that are billable, non-billable, credited and excluded.

Concept Information

Utilization Calculations

About Utilization Calculations

About Utilization Formulae

Related Tasks

Calculating Utilization

Setting up Utilization

Recalculating Utilization