Billing Forecast Curve Fields

Here is a description of the fields on a billing forecast curve record.

Key:
* – Mandatory field.R – Read-only.

Field   Description
Lag *

The lag, in days, to apply before starting billing forecast curve calculations.

  • For Opportunity forecast curves, the lag is based on the opportunity Close Date.
  • For Unscheduled Backlog forecast curves on a project, the lag is based on the day the calculation is run.

The default value is 0.

Max Billing Forecast Period R Roll-up summary of the length of the billing forecast periods.
Total Curve Period R Roll-up summary of the maximum billing forecast periods and lag.