Project Fields

Here is a description of the fields that make up a projectClosedA collection of activities and related items to be managed over a defined time range, such as timecards, expenses, milestones and budgets. record. Some of these fields may not be visible or editable at all times, or in all package combinations.

Key: R – Read-only.

Information and Project Detail

Field   Description
Account   Lookup to the related accountClosedAccounts in the context of FinancialForce PSA are the same as accounts in Salesforce. Users can create and view certain FinancialForce PSA data related to the account on the related lists. for the project. Enter the customer account for the project, unless you are using it to track items other than revenue such as vacations or internal non-billable projects.
Actuals: Last Recalc Date   The date actuals were last recalculated for the project.
Actuals: Last Update Date   The date and time actuals were last updated for the project.
Actuals: Last Updated By   Lookup to the related user for the last update date.
Actuals: Need Recalc   Indicates whether project actuals need to be re-calculated for the project.

When you change the master or parent project in a project hierarchy, the Actuals: Need Recalc checkbox is automatically selected on both the original master/parent project and the new master/parent project. You can control this behavior through the handleProjectTrigger.SetActualsNeedRecalc trigger setting.

Projects for which actuals need to be recalculated are included when you recalculate project actuals for selected projects, either manually or on a schedule. For more information, see Recalculating Resource and Project Actuals.
Baseline R Baseline version of this project.
Baseline End Date R End date recorded on the project baseline.
Baseline Phase R Project phase recorded on the project baseline.
Baseline Stage R Stage recorded on the project baseline.
Baseline Start Date R Start date recorded on the project baseline.
Billing Queues Need Recalc   Indicates whether billing queues need to be re-calculated for the project.

When a process changes the Exclude from Billing field, the Billing Queues Need Recalc is automatically selected.

Your administrator can write Apex to schedule project billing recalculation using the Billing Generate Queue class. Projects for which billing needs to be recalculated are included when the project billing recalculation occurs. For more information, see Scheduling Billing Queue Recalculation.
Billing Type   Type of billing, such as Fixed Price or Time and Materials. A Time and Materials project tracks hours entered by resources with assignment and schedules as the main method of billing.
Company   Lookup to the related Foundations company.
Copy Child Records from Template Async   Determines whether project-related data including tasks are created in asynchronous mode when you click Create Project From Template. This field is only enabled for use when your administrator has added it to the Create Project From Opp And Template Project Columns field set. See Project Field Sets for more information.
Currency   When working with multiple currencies, allows you to choose a currency to report the project figures in when different from the default currency for your Salesforce org.
End Date   Date this project ends.
Exclude from Backlog   Indicates whether the project is to be excluded from backlog calculations.
Exclude Project from Display on Billing   If selected, excludes the project from displaying on the billing screen.
Group   Lookup to the related groupClosedA level of hierarchy used in PSA to which other objects belong such as resources, opportunities and projects. to which the project actuals roll up to.
Include In Forecasting   Indicates whether the project is to be included in forecasting.
Location   The project's location.
Notes   Enter project staffing notes.
Opportunity   Lookup to the related opportunity. Enter the opportunity for the project unless you are using it to track items other than revenue such as vacations or internal non-billable projects.
Opportunity Owner   Contact who owns the related opportunity.
Practice   Lookup to the related practiceClosedA level of hierarchy used in PSA to which other objects belong such as resources, opportunities and projects. to which the project actualsClosedTotals for a given time period. roll up to.
Pre-Bill Type R The type of pre-billing selected for the project. This indicates whether the customer has been pre-billed for a part of the budget or all of it.
Project ID R Unique project identifier assigned by the system.
Project Manager  

Lookup to the related contact. Used on the resource plannerClosedA graphical tool that gives you an organized, comprehensive view of resources and the projects to which they are assigned..

Note: This field is mandatory if you are syncing the project to a Jira project using the Integration Hub Connector: Jira - PSA.
Project Name   Name of the project. Should relate to the accountClosedAccounts in the context of FinancialForce PSA are the same as accounts in Salesforce. Users can create and view certain FinancialForce PSA data related to the account on the related lists. and opportunity.
Project Phase   Current phase of the project.
Project Type   Classification of the project.
Rate Card Discount Limit   Sets the rate card's minimum suggested bill rate to which the discount will be applied.
Rate Card Percentage Discount   Sets the discount in percent applicable on a rate card's suggested bill rate when creating or updating a resource request or assignment on a project.
Rate Card Set   Specifies the rate card set, composed of multiple separate rate cards, which determines which rate cards are applied to the project.
Region   Lookup to the related regionClosedA level of hierarchy used in PSA to which other objects belong such as resources, opportunities and projects. to which the project actuals roll up to.
Services Billing Time Period Type   The time period type to use when generating billing events and billing event batches for the project.
Share with Project Manager   Indicates whether project related business records such as milestones are shared with the project manager.
Share with Project Resources   Indicates whether project related business records such as milestones are shared with resources assigned to the project.
Stage   Current stage of the project.
Start Date   Date this project starts.
Template   Indicates whether this project is a template and appears in the list of projects when you click Create Project From Template.
Time Zone   The project time zone is used when creating tasks for a project in Gantt.
Version Config   The version config record to use when creating a version for this project. If not defined, your organization's default version config is used.
Work Calendar   The associated Work Calendar.

Project Tracking

Field Description
Alert Recipient

Lookup to available contacts. An email is sent to the selected contact when the value in the Percentage Used field equals or exceeds the value in the Alert Threshold field. No email is sent if this field is blank or if no email address is recorded for the selected contact. Apply Billing Cap must be selected and there must also be a value in the Alert Threshold field.

For details of how to customize the email template, see the Salesforce help. To open the template:

  1. From Setup, in the Administration section, select Email | Classic Email Templates.
  2. Open the folder PSA: Billing & Invoice Management, and edit the template PSA - Project Threshold Alert.
Alert Threshold Triggers an email when Percentage Used equals or exceeds the percentage value entered. Apply Billing Cap must be selected and there must also be a contact in the Alert Recipient field.
Apply Billing Cap Checkbox to trigger an email when the project billings total is over a threshold percentage of its bookings total. There must be a contact in the Alert Recipient field and there must also be a value in the Alert Threshold field.
Percentage Used The percentage of bookings that are already ready-to-bill, including any pre-billed amount.
Remaining Amount The bookings amount minus ready-to-bill records and any pre-billed amount.

Project Status

Field   Description
Baseline Project Status R Project status recorded on the project baseline.
Financial Status   Indicates the current financial status of a project, based on the color displayed in the corresponding Financial Status picklist.
Financial Status   Picklist linked to the corresponding Financial Status color indicator field. You can select the color manually (Green, Yellow, or Red). Alternatively, you can use Salesforce Process BuilderClosedA Salesforce graphical UI workflow tool allowing the creation of business processes to automate tasks without having to write code. or a workflow rule to apply your own logic and control the behavior of the Financial Status color indicator, based on the value displayed in another field.

See the Salesforce Help for more information on how to use Process Builder and workflow rules.
Planned Hours   The number of planned hours for the project. This field exists on projects, assignments, and milestones and is for simple planning purposes. When a project is created from a template, the number of hours from the template is copied to this field.
Project Status   Indicates the status of the project, based on the color displayed in the corresponding Project Status picklist.
Project Status   Picklist linked to the corresponding Project Status color indicator field. You can select the color manually (Green, Yellow, or Red). Alternatively, you can use Salesforce Process BuilderClosedA Salesforce graphical UI workflow tool allowing the creation of business processes to automate tasks without having to write code. or a workflow rule to apply your own logic and control the behavior of the Project Status color indicator field, using the value displayed in another field. For example, you could configure the Project Status field to update automatically by applying logic that uses the value in the Project End Date field.

See the Salesforce Help for more information on how to use Process Builder and workflow rules.
Project Status Notes   Notes on the project status.
Schedule Status   Indicates whether the project is on schedule, based on the color displayed in the corresponding Schedule Status picklist.
Schedule Status   Picklist linked to the corresponding Schedule Status color indicator field. You can select the color manually (Green, Yellow, or Red). Alternatively, you can use Salesforce Process BuilderClosedA Salesforce graphical UI workflow tool allowing the creation of business processes to automate tasks without having to write code. or a workflow rule to apply your own logic and control the behavior of the Schedule Status color indicator field, based on the value displayed in another field.

See the Salesforce Help for more information on how to use Process Builder and workflow rules.
Scope Status   Indicates the current scope status, based on the color displayed in the corresponding Scope Status picklist.
Scope Status   Picklist linked to the corresponding Scope Status color indicator field. You can select the color manually (Green, Yellow, or Red). Alternatively, you can use Salesforce Process BuilderClosedA Salesforce graphical UI workflow tool allowing the creation of business processes to automate tasks without having to write code. or a workflow rule to apply your own logic and control the behavior of the Scope Status color indicator field, based on the value displayed in another field.

See the Salesforce Help for more information on how to use Process Builder and workflow rules.

Project Attributes

Key: G – Used in global projects.

Field   Description
Active  

Indicates whether this project is active. When deselected, this project's Scheduled Backlog will not be calculated or reflected in roll-ups. Also when deselected, you cannot enter, delete or materially update further business records on this project.

Note: You cannot deactivate a project that has active child projects.
Billable G Indicates whether this project is billable. When deselected, this project's numbers will not be reflected in any billing information.
Exclude From Billing   Indicates whether this project should be excluded from billing events.
Exclude from Project Variance Batch   Indicates whether this project should be excluded from the Calculate Hours Variance on Projects batch job that is run from the PSA Administration tab.
Closed for Time Entry   Indicates whether this project is closed for timecard entry.
Closed for Expense Entry   Indicates whether this project is closed for expense entry.
Exclude from Project Planner   Indicates whether this project is hidden from view in the project plannerClosedA graphical tool that gives you an organized, comprehensive view of projects and the resources assigned to them..
Allow Self Staffing   Indicates whether resources have permission to create their own assignments for the project. This overrides the staffing permission controls for the project or resource.
Allow Timecards Without Assignment G Enables the entry of timecards without the resource requiring an assignmentClosedConnection between a resource and a project..
Allow Expenses Without Assignment G Enables the entry of timecards and expenses without the resource requiring an assignment.
Time Credited   Indicates whether non-billable time should be credited for utilization. For instance, you may want time spent on consulting to count towards utilization.
Time Excluded   Indicates whether non-billable time should neither count for nor against utilization.
Daily Timecard Notes Required   Makes the entry of timecard notes mandatory.
Billable Expense Fee Percentage   Fee percentage by which to increase the billable amount of any Expense logged for the project. Set to 0% for no increase (default). Set to 100% to double the amount. The calculation applies the percentage expense fee before any flat expense fee.
Billable Expense Fee Flat   The flat fee in project currency by which to increase the billable amount of an expense logged to the project. The increase is applied after any percentage fee increase. The default value is taken from the Billable Expense Fee Flat field on the project.
Expense Notes   Makes the entry of expense notes mandatory.
Share with Project Manager   Enables the sharing of project information with the user designated as project manager.
Share with Project Resources   Enables the sharing of information such as milestones with resources assigned to the project.
Hours to Days Rule   Lookup to the hours to days rule to apply when calculating the number of hours on a timecard day that count as a day or a half day when using daily rates for billing and cost calculations. For further information, see About Hours to Days Rules.

Project Cost and Revenue Summary

The following notes apply to the Project Cost and Revenue Summary Visualforce page:

Note:

The fields listed below are used by Project Cost and Revenue Summary Visualforce page and are not fields on the Project object.

All fields are read-only.

Field Description
Bill Rate

Taken from the Bill Rate field on an assignment, or from the combined value of the Suggested Bill Rate Number and Suggested Bill Rate Currency Code fields on a resource request.

If the Suggested Bill Rate Number field on a resource request is blank or zero, the value in the Requested Bill Rate Number field is used. If the Bill Rate field is blank on an assignment, or the Requested Bill Rate Number field on a resource request is blank, a hyphen is displayed.

If Bill Rate is Daily Rate is set to true on an assignment, the bill rate per hour is calculated and displayed. If, however, Use Scheduled Days for Calculations is set to true in the Assignment Settings custom setting, the bill rate per day is displayed.

The bill rate value in the Totals row shows the average bill rate (Total Estimated Revenue divided by Total Hours), provided Use Scheduled Days for Calculations is set to false in the Assignment Settings custom setting.

Note:

If a resource request is linked to an assignment, the bill rate values are taken from the assignment only and bill rate values on the linked resource request are ignored.

Cost Rate Taken from the Cost Rate field on an assignment, or from the Average Cost Rate field on a resource request.

If the resource request is a held resource request, the cost rate is taken from the Default Cost Rate field on the resource.

If Default Cost Rate is Daily Rate is set to false on a resource, the Default Cost Rate is used. If, however, Default Cost Rate is Daily Rate is set to true on a resource, the cost rate is calculated as follows:
  • The Default Cost Rate is divided by the average of non-zero or non-blank hours recorded in the Mon to Sun fields on the resource’s work calendar.
  • If all Mon to Sun fields on the associated work calendar are zero or blank, the Default Cost Rate is divided by the Standard Hours Per Day value on the resource’s work calendar.
  • If the Standard Hours Per Day value is zero or blank, or the resource does not have a work calendar, the Default Cost Rate is divided by eight.

For assignments, if Cost Rate is Daily Rate is set to true, the cost rate per hour is calculated and displayed. If, however, Use Scheduled Days for Calculations is set to true in the Assignment Settings custom setting, the cost rate per day is displayed.

The cost rate value in the Totals row shows the average cost rate (Total Estimated Cost divided by Total Hours), provided Use Scheduled Days for Calculations is set to true in the Assignment Settings custom setting.
Note:

If a resource request is linked to an assignment, the cost rate values are taken from the assignment only and cost rate values on the linked resource request are ignored.

Estimated Cost If the cost rate is per hour, the value is Total Hours multiplied by Cost Rate, broken down by role.

If the cost rate is per day, the value is Total Days multiplied by Cost Rate, broken down by role.
Estimated Margin % Total Estimated Margin divided by the Total Estimated Revenue, expressed as a percentage.
Estimated Revenue If the bill rate is per hour, the value is Total Hours multiplied by Bill Rate, broken down by role.

If the bill rate is per day, the value is Total Days multiplied by Bill Rate, broken down by role.
Milestone Amount Taken from the Milestone Amount value recorded on the corresponding milestone record.
Milestone Cost Taken from the Milestone Cost value recorded on the corresponding milestone record. A Milestone Cost value is not displayed if Log Milestone Cost As External is false on the milestone record.
Milestone Name Taken from the Milestone Name field on the corresponding milestone record.
Resource Role Lists the roles that appear on all relevant assignments and resource requests.
If multiple assignments and resource requests are recorded for a single role, the values for Total Hours, Estimated Cost, and Estimated Revenue are totaled and displayed on one line, provided the following are the same:
  • Cost Rate
  • Bill Rate
  • Cost Rate unit of measurement (per hour/per day)
  • Bill Rate unit of measurement (per hour/per day)
  • Currency
Target Date Taken from the Target Date value recorded on the corresponding milestone record.
Total Estimated Cost The sum of the values in the Estimated Cost column plus the sum of the values in the Milestone Cost column.
Total Estimated Margin Total Estimated Revenue minus the Total Estimated Cost.
Total Estimated Revenue The sum of the values in the Estimated Revenue column plus the sum of the values in the Milestone Amount column.
Total Assigned Days Total number of days recorded on the relevant assignments when Use Scheduled Days for Calculations is set to true in the Assignment Settings custom setting. This value only includes the days from assignments and not from resource requests.
Total Hours Per Role

The combined hours of resources for specific roles, calculated from the following fields:

  • Requested Hours field on resource requests.
  • Scheduled Hours field on assignments.
Total Hours/Days

This column is only displayed if Use Scheduled Days for Calculations is set to true in the Assignment Settings custom setting.
The values in this column are broken down by role and are taken from the following fields:

  • Scheduled Hours field on the relevant assignments
  • Scheduled Days fields on the relevant assignments
  • Requested Hours field on the relevant resource requests

Task Information

Field   Description
Tasks Total Points   Total of points on all project tasks.
Tasks Total Points Complete   Total of points on completed project tasks.
Tasks Total Percent Complete (Points) R Percentage of project tasks that are complete based on task points.
Total Number of Tasks   Total number of project tasks.

Project Monitor

Key: R – Read-only.

Field   Description
Planned Hours   Number of hours planned for the project.
Total Assigned Hours R Total number of hours from project assignments.
Total Projected Revenue From Assignments R Total projected revenue from all project assignments

Selected Time Period

Key: R – Read-only.

Field   Description
Action: Update Current Time Period   Indicates whether project numbers within the current time period are to be updated when you next save the project. Use this checkbox to update project numbers after changing the Project Time Period field.
Current Time Period R Name of the current time periodClosedA period of time with a start date and an end date to which forecasts, actuals calculations, billing event batches, utilization calculations and region plans belong..
Current Time Period End Date R Last day of current time period.

Actuals

Actual values, for the project, at a given point in time, based on selected time period. All read-only.

Revenue Actuals

Field   Description
Billed   Sum of billed amounts. Expenses, timecard splits and miscellaneous adjustments that are billable contribute to billed revenue after they are billed/invoiced. Milestones contribute to billed and invoiced revenue after they are billed/invoiced.
Billings   Sum of ready-to-bill revenue from timecards, milestones, and miscellaneous adjustments.
Bookings   Booked revenue for this project. Budgets of type Customer PO and Customer PO Change Order contribute to bookings.
Expense Budget   Sum of expense budgets for the project. The Expense Amount field of a budget contributes to this field if the budget is of type: Customer PO, Customer PO Change Order, Internal Budget or Internal Budget Change Request.
Internal Budget   Sum of internal budgets for the project. The Amount field of a budget contributes to this field if the budget is of type: Internal Budget or Internal Budget Change Request.
Invoiced   Sum of invoiced amounts. Expenses, timecard splits and miscellaneous adjustments that are billable contribute to invoiced revenue after they are billed/invoiced. Milestones contribute to invoiced revenue after they are billed/invoiced.
Margin   Billings minus Total Costs.
Pass-Through Billing   Sum of pass-through billings, including expenses.
Pre-Billed   Amount already billed for the project.
Revenue   Revenue is not calculated or rolled up. Enter a miscellaneous adjustmentClosedA catch-all business record that allows you to correct data entry errors or adjust transactions. to show revenue on the project actualsClosedTotals for a given time period..

Cost Actuals

Field   Description
Internal Costs   Sum of internal costs, whether billable or not.
Internal costs are only for resources that are not marked as External. They are calculated using this formula:
Approved timecard hours * Cost rate
External Costs   Sum of external costs, whether billable or not.
Milestones may contribute to flat External Cost if the External Cost field is completed, and the Log Cost as External checkbox is selected. For example, when you count subcontractor fees as a flat cost amount that helped you reach the milestone and achieve the billings.
Expense Costs   Sum of approved expenses in expense reports, whether billable or not.
Other Costs   Any other project costs. Other costs might include things like material or capital costs incurred on the project. These are only generated through miscellaneous adjustments which can also generate any other category of revenue or cost. The Amount field of a budget also contributes to this field if the budget is of type Work Order or Work Order Change Request.
Total Costs   Total costs from all projects in the project hierarchy.

Change Record

These fields record the user who last made changes to the actuals fields and when the change was made.

Field   Description
Actuals: Last Update Date   Date on which the Actuals fields were last updated.
Actuals: Last Updated By   Name of the user who made the last change to the Actuals fields.

Project Variance

Note:

Project Variance values only relate to the project being viewed and don't include values from sub-projects.

Project Variance Fields

The following fields on the Project object enable you to monitor and report on project variance.

Tip:

To exclude a project from the Calculate Hours Variance on Projects batch job that is run from the PSA Administration tab, select Exclude from Project Variance Batch in the Project Attributes section.

Key: R – Read-only.

Field

 

Description

Estimated Hours at Completion R An estimate of the total hours to be spent on a project. Calculated using Total Submitted Hours plus Scheduled Hours Remaining.
Hours Cut Off Date R The date used to calculate a project's variance values. The date last week that corresponds to the last day in the project's work calendar is used. If no work calendar exists, last Sunday's date is used.
Percent Hours Complete R The percentage of hours already completed on the project. Calculated using Total Submitted Hours divided by Estimated Hours at Completion multiplied by 100.
Scheduled Hours Remaining R The number of hours not yet spent on a project. Calculated using assignments whose end date comes after the Hours Cut Off Date and takes into account scheduled hours and schedule exceptions.
Total Submitted Hours R The number of hours spent on a project. Calculated using the total hours on submitted or approved timecards, when the Assignment lookup is not blank and the end date is before or the same as the date in the Hours Cut Off Date field.
Variance at Completion R The difference between the original number of planned project hours and the Estimated Hours at Completion. Calculated using Planned Hours on a project minus Estimated Hours at Completion.
Variance from Plan R The difference between the number of planned project hours and the number of submitted or approved timecard hours. Calculated using Planned Hours on a project minus Total Submitted Hours.

Project Variance Visualforce Page

Note:

The fields listed below are used by the Project Variance Visualforce page. If preferred, you can use the Project Variance fields on the Project object, as they enable you to monitor and report on Project Variance. For more information, see Project Variance Fields.

Key: R – Read-only.

Field   Description
% Hours Complete R Percentage of hours already completed on the project against total anticipated hours. Calculated using Total Approved and Submitted Hours divided by Estimated Hours At Completion multiplied by 100.
Cut Off Date R Date used to calculate a project’s variance values. The last day in the week of the project's work calendar is used. Without a project work calendar, the last Sunday before today's date is used. Today's date is used when today is Sunday.
Estimated Hours At Completion R Latest estimate of the total hours to be spent on the project. Calculated using Total Approved and Submitted Hours plus Scheduled Hours Forward.
Scheduled Hours Forward R Hours not yet spent on a project. These are the total number of scheduled project hours (based on associated assignments) from a day after the cut off date up until the last scheduled date. This may be after the project end date when any assignments exceed the project end date.
Total Approved and Submitted Hours R

Time spent on a project. Calculated from approved and submitted timecard hours on the project with a week ending date up to and inclusive of the cut off date.
Timecards with a week ending date after the cut off date are excluded from the calculation even when time has been submitted and approved up to and including the cut off date.

Variance At Completion (VAC) R Difference between the original number of planned project hours and the current estimate for the total hours. Calculated using Planned Hours minus Estimated Hours At Completion. VAC may be a negative number when the Planned Hours field is not populated with a value, or when the current estimate for Total Hours exceeds Planned Hours.
Variance From Planned R Difference between the number of planned project hours and the number of approved or submitted timecard hours. Calculated using Planned Hours minus Total Approved and Submitted Hours. Planned Hours and Total Approved and Submitted Hours values relate to the project being viewed and exclude rolled up values from sub-projects.

Time Actuals

Field   Description
Billable Hours (External)   Not included in utilization calculation.
Billable Hours (Internal)   Included in utilization calculation.
Credited Hours   Hours taken from timecards where the project has Time Credited checkbox selected.
Excluded Hours   Hours taken from timecards where the project has Time Excluded checkbox selected.
Non-Billable Hours (External)   Not included in utilization calculation.
Non-Billable Hours (Internal)   Not included in utilization calculation.

Backlog

When you run a backlog calculation the details are copied from the backlog detail object to the project.

Field   Description
External Time Cost   Value of the aggregated cost calculation for external resources in scheduled project backlog.
Billing Forecast Curve   A lookup to the related Billing Forecast Curve field. For more information, see Billing Forecasting Overview and Managing Curves for Billing Forecasts.
Internal Time Cost   Value of the aggregated cost calculation for internal resources in scheduled project backlog.
Milestone Cost   Value of the milestone cost calculation in scheduled project backlog. This value is zero unless the Log Milestone Cost As External field is selected on the Milestone object.
Scheduled Backlog Amount   Value of scheduled hours backlog. This is the expected revenue pertaining to resources assigned or milestones scheduled on a project.
Scheduled Backlog Calculation Date   Start date of scheduled backlog calculation (usually today).
Scheduled Backlog End Date   End date of scheduled backlog calculation
Scheduled Milestone   Value of scheduled milestone backlog.This value depends on the time period. For instance if the backlog is calculated for all time periods, the value includes all time periods up to the end of the last future milestone. Milestone backlog is generated from amounts associated with milestones with target dates in the forward looking backlog date range that have not yet been achieved where Include In Financials is false. These milestones represent expected future billings.
Scheduled Time   Value of scheduled time backlog. This value depends on the time period. For instance if the backlog is calculated for all time periods, the value includes all time periods up to the end of the last assignment. Scheduled time backlog is generated from billable assigned time multiplied by the assignment bill rate in the forward-looking backlog date range. This represents the future expected corresponding billable timecards.
Unscheduled Backlog   Value of the unscheduled backlog. This field only applies to perpetual time periods, usually all time periods. This is the remainder of project budget bookings that have not yet been allocated to actuals or to milestones or assignments. This is the budget minus actuals billings and scheduled milestone and time backlog. These might be in different time periods, so only the unscheduled backlog for the All Time Periods calculation for is usable.
Backlog: Last Update Date   Date on which the Backlog fields were last updated.
Backlog: Last Updated By   Name of the user who made the last change to the Backlog fields.

Billing Eligible Records

Key: 1999 - The maximum number of records you can track in this field is 1999.

Field

Key

Description
Action: Count Billing Eligible Records   Indicates whether the fields above are updated when you save the project. When you save the project, the checkbox is automatically deselected.
Add BEIs to Existing Batches   If selected, all existing billing event items are added to an existing billing event instead of creating a new billing event.
Billing Eligible Last Updated   Displays the date on which the Billing Eligible fields were last updated on the project.
Billing Eligible Budgets

1999

Number of budgets that are currently available for billing event generation.
Billing Eligible Expenses

1999

Number of expenses that are currently available for billing event generation.
Billing Eligible Milestones

1999

Number of milestones that are currently available for billing event generation.
Billing Eligible Misc Adjustments

1999

Number of miscellaneous adjustments that are currently available for billing event generation.
Billing Eligible Timecard Splits

1999

Number of timecard splits that are currently available for billing event generation.

In addition, for an item to be eligible for billing, the following applies:

Project Hierarchy

Field   Description
Parent Project   Next level up in the project hierarchy.
Master Project   Highest project in the hierarchy.
Hierarchy Depth   Level within the project hierarchy.
Project Name Chain   Name of system-generated chain for linking to the project.
Project ID Chain   ID for system-generated chain for linking to the project.

Revenue Forecast

Field Description
% Hours Completed for Recognition Percentage of hours completed on this project, to be used in Revenue Forecasting calculations.

When you run a revenue forecast on this project, the following calculation is used to work out the value in this field:
(Sum of approved timecard hours/Value in the field selected from the Total Hours Field on Project picklist on the revenue forecast setup record) * 100

If there is no active forecast setup record, the Total Hours Field on Project picklist defaults to Estimated Hours at Completion. For more information, see Revenue Forecast Setup Fields.

This field is only populated if one of the following applies:
  • "% Complete" is displayed in the Recognition Method field.
  • You are using the integration between PSA and FinancialForce Revenue Management and this project looks up to a template of type "% Complete" in Revenue Management.
Recognition Method

Recognition method to apply to this record for Revenue Forecasting. The options available are:

  • Deliverable
  • % Complete
  • Equal Split: Months
  • Equal Split: Months/Part Periods
  • Equal Split: Days
  • Equal Split: 4,4,5
Notes:

This is a global picklist that is on several objects used in Revenue Forecasting.

This field is not relevant if you are using the integration between PSA and FinancialForce Revenue Management.

Revenue Forecast Batch Update Pending Indicates when this project is queued for revenue forecast processing. This is a system controlled field.
Revenue Forecast Last Updated Date and time when this revenue forecast was last updated.
Revenue Forecast Processing Status

The processing status of this revenue forecast: "Not Started", "Pending", "Processing", "Error" or "Complete".

If the process completes with errors, an error log is available from the Revenue Forecast Batch Logs related list. Refresh your browser to ensure the process status is up to date.

Integration Hub

Integration Hub Connector: Concur - PSA

The following field is available if you are using the Integration Hub Connector: Concur - PSA.

Key: R – Read-only.

Field

 

Description
Send to Third-Party Expenses Application R

Formula field that indicates if the project is eligible for syncing with a third-party expenses application, for example, with Concur.

Automatically selected if the Active field is selected and the Closed For Expense Entry field is not selected.

Integration Hub Connector: Jira - PSA

The following fields are available if you are using the Integration Hub Connector: Jira - PSA.

Key: * – Mandatory field.R – Read-only.

Field

 

Description
Sync with Jira   Determines if the project is eligible for syncing with Jira.
Jira Correlation ID  

Unique identifier of the project in Jira. Automatically populated after the project is synced with Jira.

Note: You must not edit this field unless you are manually correlating the project with an existing Jira project or issue.

Jira Project *

Key of the Jira project this project will be created as an issue in.

Notes:
  • You must manually add the keys of your Jira projects to this picklist field.
  • Only applicable if you are syncing PSA projects with Jira issues.
Jira Project Key *

Unique key of the project in Jira used to prefix issues.

Note: Only applicable if you are syncing PSA projects with Jira projects.
Jira Project Type *

Project type in Jira. The following values are available:

  • "Software" - the project is created in Jira using the Basic software development template.
  • "Business" - the project is created in Jira using the Task management template.
Notes:
  • After a project is created in Jira, its type cannot be changed from PSA. If you need to change the project type, you must do so manually in both applications.
  • Only applicable if you are syncing PSA projects with Jira projects.
Jira Project URL R

Hyperlink to the related project in Jira.

Optional Related Lists

Buttons

Button Description
Apply Rate Card Discount Enables you to apply a rate card discount to project resource requests that have not been assigned or held.
Create Change Request Displays the Create Change Request page, which you can use to create a new change request opportunity from the project.
New Project Version Enables you to create a new project version.
Generate Resource Requests Displays the Generate Resource Requests from Project Task Assignments page.
Manage Project Tasks / Project Gantt Displays the PSA Task Management page where you can manage project tasks.
Project Planner Displays the Project Planner.
Run Revenue Forecast Enables you to run a revenue forecast for this project.
Share Project Displays the Share Project page where you can share related objects such as milestones with resources assigned to the project.